
5. Operation indicator
1) Inspection
CD
Connect power socket
to
connector
J2
of
PWB
unit and turn power on.
(Z;
Let drive select 0
of
interface signals be
at
low
levels
(make a short between J1·B terminal
of
PWB
and
PWB
Ground). and make short pin
DSO
circuit shorted. (Do
not
prolong this test.)
Note
that
the voltage range between connector
J3·B 1 0 (red lead of
the
10th pin from power
socket) and J
3-A
10 (upper black lead
of
the 10th
pin from power socekt) will be
DC
1
to
2V when
the
lamp
is
lit.
2)
Replacement
CD
Remove
PWB
unit (refer
to
page 14).
@ Datach 2 lead wires of operation indicator from
the
housing
of
connector J3, and take lead wires
out
of
the
wire holder.
CID
Open
the
front door.
@)
Remove 2 front bezel fixing screws (3 mm) and
the front
bezel itself by pulling it forward.
@)
Draw
out
the
holder 2 with tweezers
in
the
arrow
direction. Take
out
LED
holder. (See the sketch
at
right.)
@ Draw
LED
out
of
the
LED
holder. To assemble,
take the reverse order.
(j) Carry
out
inspection, referring
to
the above
instruction.
Main frame side
Front
bezel
Front
door
-9-
Pull-out
direction
Note:
Front
bezel
LED
holder
Pull-out
direction
~
~
z~"
1.
Attach the
front
bezel assembly, by pushing it
to
main frame side and main frame stopper. (See the
sketch
below.)
2.
Do not pull up the carrier with fingers, otherwise
excessive force
is
applied
to
the
head arm.
Main frame stopper
Main frame side
1)'
Front
bezel
fixing
screw
Push
Comentarios a estos manuales