Sharp R-4A55 Manual del operador Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
14
throttle lInkage and IgnItIon leads
1. Close choke and remove air lter cover.
2. Place inner throttle cable in large hole of carburetor swivel (A).
3. Loosen nuts (B) and place threaded end of throttle linkage in
bracket slot. Finger tighten nuts (B).
4. Check throttle for freedom of movement and that wide open
throttle / low idle extremes are adjusted properly. If adjustment
cannot be achieved with adjusting nuts (B), consult with your Echo
Dealer for correct adjustment procedure. Tighten nuts (B).
5. Connect 2 ignition stop leads (C,D) from throttle cable tubing to 2
ignition leads (C,D) on engine.
C
D
C
D
A
B
6. Gather ignition wires and position behind air lter case.
7. Install air lter and cover.
balance and adjust unIt
1. Loosen harness clamp screw.
2. Put on harness and attach unit to harness.
3. Slide harness clamp (A) up or down until unit balances with head
approximately 50-75 mm (2 -3 in.) from the ground.
4. Tighten harness clamp screw.
5. Loosen upper U-Handle clamp screws (B), and position U-Handle
for comfortable operation.
6. Tighten U-Handle clamp screws and 8 mm clamp bolt securely.
A
B
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 39 40

Comentarios a estos manuales

Sin comentarios