Sharp IV-S30 Manual de usuario Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 331
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
1-26
Setting and Operating Outline
1
Yes
No
No
No
Yes
Yes
Is the light level
monitor selected?
Execute the light level
monitor function
No
Yes
Start (measurement start input ON)
*1
External interface inhibit
(keys, communications, parallel)
PC calculation
Parallel output (Y0 to Y15), "READY" OFF
READY ON
Was an error detected?
Was an error detected?
1 (To the next page)
2 (To the next page)
Executing measurement 0 using
camera 2
Executing measurement 0 using
camera 1
Measurement timer start
Reading the object type No.
Image capturing (camera 1/2)
[Measurement program that is
selected]
- Positional deviation measurement
Capture the scan line range that was
specified when setting the
measurement conditions.
*1 The measurement start input is
set to "PARALLEL" and the
’READY’ ON signal to "end of
image capture."
[2] Operation flow after the measurement start input is turned ON.
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 330 331

Comentarios a estos manuales

Sin comentarios