Sharp 32L-X2000 Manual de instrucciones

Busca en linea o descarga Manual de instrucciones para Televisores y monitores Sharp 32L-X2000. Sharp 32L-X2000 Instruction manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 77
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
XE301P
tirak
®
Service & Maintenance Manual
for Electric Powered Hoists
Date: 06/28/05
Version:1
Vista de pagina 0
1 2 3 4 5 6 ... 76 77

Indice de contenidos

Pagina 1 - Version:1

XE301Ptirak®Service & Maintenance Manualfor Electric Powered HoistsDate: 06/28/05Version:1

Pagina 2 - Table 001

3-6 Internal Inspection1) Remove and inspect the stirrup adapter{Code #47867, Pos. 86} in Figure 310. Ensure it is straight and the anchor pinis secu

Pagina 3 - “Exploded Views”

5) Remove the entrance tube {Code #40365, Pos. 49} and snap ring {Code #6846, Pos.57} as shown in Figure 320. Inspect theentrance tube and snap ring

Pagina 4 - 1-1 UL Listing Card

10) Inspect the two roller pressure system {Code #23257 Pos. 80} shown in Figure 316.This inspection must be carried out every time the casing cover i

Pagina 5 - E 3 0 1 P 1

g) Inspect the rollers to ensure they roll freelyand are not damaged. (Figure 331).11) Inspect the carryimg handle for damage and{Code #40335 Pos. 34}

Pagina 6 - 1-3 Test Certifacte XE301P

2) Carefully place the casing cover over the pressure system dowel pin. Ensure it sits directly over the pin!!! (Figure 334).3) Place one hand on the

Pagina 7 - Figure 201

3-10 Wire Rope Guide Band Replacement{Code #24187, Pos. 9}Though replacement is rare, it may be necessaryif damaged beyond repair. This procedurerequi

Pagina 8 - Figure 304

10) Press or use a rubber mallet to push the sheave into place. The air will expel from theoil plug. The sheave should move into position as air escap

Pagina 9 - Figure 309

174) If replacement is necessary, using the correctgear puller remove the bad bearing as shownin Figure 343.5) Reinstall the new bearing and gently se

Pagina 10

Drawing No 27610Edition US-1Date 1/05Page 1 / 2Position Part # Qty. Description Specifications List Price-- 22048 1 Wire rope drive complete X300 700#

Pagina 11 - Figure 324

Drawing No 27610Edition US-1Date 1/05Page 2 / 2Spare PartsXE301P - 110VWire rope drive

Pagina 12

Repair and maintenance of the Tirak hoist shouldalways be accomplished in a safe environment!The purpose of this sheet is for quick referenceonly. Mo

Pagina 13 - Figure 331

4) GEARBOX4-1 Required Tools (Figure 401)- 17 mm wrench or adjustable wrench- Allen keys 8 mm, 5 mm- internal and external snap ring pliers- 2 pry

Pagina 14 - Figure 334

2c) Remove the pressure spring {Code #23257,Pos. 80, refer to 27610, Section 3-13} as shown in Figure 406.2d) Remove the inlet tube {Code #40365, Pos

Pagina 15 - Figure 339

3) Using a 10 mm hex, remove the oil plug {Code #37646, Pos. 68} and drain the synthetic gear oil into a clean bucket. Inspect the oil for brass flake

Pagina 16 - Figure 342

9) Remove the snap ring {Code #536, Pos 13} that sits on the input shaft (Figure 418).10) Remove the seal {Code #39306, Pos. 23, Figure 419}. The s

Pagina 17 - Figure 343

15) Using a rubber dead blow mallet, hit the shaftpinion {Code #22367, Pos. 5} as shown in Figure 424. After several careful hits, the pinion gear as

Pagina 18 - XE301P - 110V

20) Remove the steel worm {Code #22397, Pos.7} through the large gearbox opening as shown in Figure 430.21) Inspect the worm gear for wear, damage, or

Pagina 19

4) Install the lower cup seal {Code #39376, Pos.39} as shown in Figure 435.5) Insert the large brass gear {Code #22387, Pos. 6} into the gear case as

Pagina 20 - Figure 405

8) Take the tool for inserting the top seal {Code#39306, Pos. 23} and place the seal on the tool as shown in Figure 441.8a) Hammer the seal {Code #393

Pagina 21

4-3 Emergency Controlled Descent Brake XE301PThe controlled descent brake is found betweenthe motor and gearbox. It is sealed and thereforeshould be

Pagina 22

4-6 Oil Level Gearbox29Hoist-Position for Oil Level InspectionFigure 452WARNINGUSE MINERAL OIL ONLY!Temperature Range: 14 to 122 °F-10 to +50 °CAPI S

Pagina 23

31) GENERAL INFORMATION1-1 UL Listing Card1-2 Model Identification Table1-3 Test Certificate2) SECONDARY BRAKE ATTACHMENT2-1 BSO500 - Secondary Brake

Pagina 24

Drawing No E-3205Edition US-1Date 1/05Page 2 / 2Position Part # Qty. Description Specifications List Price-- 42707 1 Casing base with gears X300 for m

Pagina 25 - Figure 433

Drawing No E-3205Edition US-1Date 1/05Page 2 / 2Spare PartsXE301P - 110VGearbox

Pagina 26

5) PRIMARY BRAKE FOR MOTOR5.1 Brake TypeAll Tirak XE301P hoists are fitted with theadjustable Precima type brake. This sectioncovers the service and

Pagina 27

2) Inspect the inside of the fan cover for excessive brake dust (Figure 507). This indicates brake wear caused by an incorrectly adjusted brake or po

Pagina 28 - Figure 451

5.4 Brake Removal1) Remove the fan snap ring {Code #3866, Pos.21} shown in Figure 512.2) Remove the fan {Code #16186, Pos. 7} withtwo screwdrivers pla

Pagina 29 - Figure 452

356) Remove the brake rotor {Code #47416, Pos.38} and inspect it (Refer to Section 5-6). Replace if worn or damaged (Figure 517).7) Remove the snap ri

Pagina 30

4) Place the whole brake assembly {Code #49746 (110 V), or #47406 (220 V) Pos. 35}(Figure 516) over the motor shaft. 5) Using a 5mm allen wrench, scre

Pagina 31

3) Tighten down the three socket head fixing screws w/locking washers. 4) Measure the air gap as shown in Figure 524.If necessary, repeat steps 1-3 u

Pagina 32 - Figure 503

6) Install the brake onto the motor. Apply silicone to the brake end shield holes prior to installation to prevent water from enteringthe motor. Re

Pagina 33

5-12 Modification CommentSubject: Adjusting of the brake release lever.Reason: Simplify assembly and inspectionThe former instructions regarding the a

Pagina 34

1) GENERAL INFORMATION1-1 UL Listing Card4Northbrook, Ilinois (847) 272- 8800Melville, New York (631) 271-6200Santa Clara, California (408) 985-2400Re

Pagina 35 - Figure 520

6) MOTOR6-1 Replacement of Motor Winding (Stator)1) Remove the fan cover M5x10 hex screws {Code #16086, Pos. 31} as shown in Figure 601.2) Remove the

Pagina 36 - Figure 523

6) Remove the friction plate {Code #62026, Pos. 36} shown in Figure 606.7) Remove the four M5x153 mm hex head screws {Code #26097, Pos. 12} holding o

Pagina 37

10) Remove the small thermal protector wires from grey X1 and X2 (Figure 612).11) Remove the four socket head cap screws and lock washers that are hol

Pagina 38 - Table 501

2) Remove the fan snap ring {Code # 3866, Pos. 21, Figure 616} and pry off the fan {Code #16186, Pos. 7} using 2 screwdrivers(See Figure 617). Make su

Pagina 39

6) Mark the position of the white centrifugal switch for easy alignment during reassemblyas shown in Figure 621.7) Loosen the 2 screws holding the cen

Pagina 40 - (stator)

11) Remove the motor shaft assembly {Code #26587, Pos. 15, Figure 627}.12) Loosen the set of screws holding the mechanical part of the centrifugal swi

Pagina 41

14) Remove the bearing. Notice that one side issealed and the other side is not (See Figure633).15) Remove the snap ring {Code #536, Pos. 20}in Figur

Pagina 42 - Figure 614

18) Check the centrifugal switch contacts for burn, malfunction, etc. Manipulate the switchto see if the contacts open and close (See Figure 639).19)

Pagina 43

21) Replace the bearing cover {Code #27935, Pos. 6, Figure 637} and reaffix the snap ring{Code #536, Pos. 20, Figure 636}. Repack the ball bearing w

Pagina 44

26) Put the cast aluminum brake end shield on the motor shaft (See Figure 652).27) Realign the switch and retighten the 3 M4x16screws {Code #16996, Po

Pagina 45

1-2 Model Identification Table5Tirak-typeX = 1 driver discL = lightweightT = 2 driver discsG = Gripwinch (for material handling only, US-version)Execu

Pagina 46

Drawing No E - 3075Edition US-1Date 1/05Page 1 / 1Position Part # Qty. Description Specifications List Price- 15648 1 Motor complete UBE80/11-4F, XE30

Pagina 47

Drawing No E - 3076Edition US-1Date 1/05Page 1 / 1Position Part # Qty. Description Specifications List Price- 15638 1 Motor complete UBE80/11-4F, XE30

Pagina 48

527) CONTROL BOX XE301P7-1 Tools Required- Volt/Ohm meter (left in Figure 701)- Digital Capacitor meter (up to 275uF)- 2 insulated screwdrivers7-2 Con

Pagina 49 - Figure 652

The two shorter prongs should not show continuity (Figure 706).7-4 Wiring Diagram Location1) Using a screwdriver, open the control box (Figure 707).2

Pagina 50

2) Check that the starting winding is not shortedto ground. There should be no continuity between W or Z and the control box casing (Figure 712). I

Pagina 51 - XE301P - 220V/1ph

557-8 Relay Coil Resistance, K1, K2, K3 1) Main relay K3 coil resistance should be approximately 310 ohms. Place the ohmmeter test probes on the A1 a

Pagina 52 - Figure 705

2) With a digital capacitor tester, measure the start and run capacitance by placing the testclips on position 4 and position 6 of the terminal board

Pagina 53 - Figure 710

7-11 Centrifugal Switch CheckWith an ohmmeter, place the the probes on position 5 and 6 of the terminal board M1 (Figure 725 on the next page). The s

Pagina 54 - Figure 715

7-15 Power Check1) Open the emergency stop by twisting the redknob. It should spring open. This should cause the main relay, K3, to energize.2) Mea

Pagina 55 - Figure 720

Drawing No E - 3068Edition US-1Date 1/05Page 1 / 2Position Part # Qty. Description Specifications List Price- 26647 1 Control box complete GG13/10.14,

Pagina 56 - Figure 724

1-3 Test Certifacte XE301P6Figure 103

Pagina 57 - Figure 727

Drawing No E - 3068Edition US-1Date 1/05Page 2 / 2GG 13/10.14 Plan #19226Spare PartsXE301P - 110V-

Pagina 58 - Figure 728

Drawing No E - 3061Edition US-1Date 1/05Page 1 / 2Position Part # Qty. Description Specifications List Price- 26637 1 Terminal box complete XE301 220V

Pagina 59 - XE301P - 110V- Direct

Drawing No E - 3061Edition US-1Date 1/05Page 2 / 2GG 13/10.3 Plan #19220Spare PartsXE301P - 220V

Pagina 67

72) SECONDARY BRAKE ATTACHMENT XE301P2-1 BSO500 Secondary Brake Mounting Parts ListTable 201Figure 201#Code Qty Description Dimensions / Comments14573

Pagina 69

718-5 Wiring Connection of Stator XE301PFigure 801

Pagina 70

729) WIRE ROPE SPECIFICATION TIRAKThere seems to be some question as to selection of wire rope due to the many people offering wire rope todayBefore T

Pagina 71 - Figure 801

739-1 Wire Rope Specifications - XE301P (Page 2 of 2)Table 10024 x 26 6 x 19 6 x 31 5 x 19 5 x 26Skyclimber CX1250 Compact Alpha1000Skyclimber CS1250

Pagina 72 - Table 1001

9-2 Labels and Nameplates 74

Pagina 73 - Table 1002

9-3 Checklist75NOTE:Completion of the checklist MUST alwaysbe done before operating the hoist.

Pagina 74 - 9-2 Labels and Nameplates

9-4 Hoist Specification LE501P176Table 1003Figure 1001Wire rope classification/construction5x19 or 5x26 withfiber core lubricated,preformed IPS orXIPS

Pagina 75 - 9-3 Checklist

77TRACTEL IncGRIPHOIST Division110, Shawmut RoadCanton, MA 02021Tel: 800-421-0246Fax: 781-828 [email protected] LTDGRIPHOIST Divis

Pagina 76

3) WIRE ROPE DRIVING SYSTEM XE301P3-1 IntroductionAlthough the drive system of the Tirak hoist isone of the most simple and reliable system in themark

Pagina 77

3-5 Casing Cover Removal1) Remove the four (5) cap screw assemblies inthe corners (Figure 305) consisting of the following:a. M6x50 socket head cap sc

Comentarios a estos manuales

Sin comentarios