Sharp 21F-A30 Manual del operador Pagina 169

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 192
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 168
MAINTENANCE AND SERVICING
Form 169000 / 169040 167 Revision C
h. Remove the auger drive pulley (K) as follows:
1. Remove the three bolts (L) from hub (M),
and remove hub and sprocket.
2. Remove the three bolts (N) from the tapered
bushing.
3. Install bolts in the two threaded holes in
bushing, and tighten to release the bushing.
4. Remove the pulley (K), bushing, and key.
i. Remove the two bolts (O), and nut and bolt (P)
attaching channel (Q) to end sheet, and remove
channel (Q).
j. Remove the three flanged lock nuts (R) that
secure gearbox (S) to header end sheet, and
remove gearbox.
O
Q
P
N
K
L
K
M
R
S
Vista de pagina 168
1 2 ... 164 165 166 167 168 169 170 171 172 173 174 ... 191 192

Comentarios a estos manuales

Sin comentarios